91免费片版下载,91免费看视频软件网站,91免费看视频下载,91免费黄色污网站APP

简体中文 | English
搜索:
首页 关于91免费片版下载 产品展示 新闻资讯 服务帮助 产品认证 案例展示 技术支持 联系91免费片版下载
当前位置 : 首页 > 技术支持 > Pipe Bender Operation >
技术支持
- Elbow Classification
- Pipe Expander Maintenance
- Pipe Bender Operation
- Plate Rolling Machine Use and Maintenance
产品分类
91免费看视频软件网站
91免费看视频下载
91免费黄色污网站APP
三通机
压力机
坡口机
模具
 
 
Pipe Bender Operation
How to Use IF Heating Pipe Bending Machine

The IF heating pipe bending machine can be used to bend pipes made of alloy steel, carbon steel, and stainless steel. It is an important piece of equipment to provide bent pipes for construction projects in petrochemical, electric power, and other fields. The operation method of induction bending machine is detailed below.

1. Install the steel pipe to be bent in place;
2. Adjust the bending radius via the screw-nut transmission device on the rocker arm rotating device;
3. Heat the steel pipe by the medium frequency induction heating coil to some temperature and start bending;
4. The steel pipe is pushed ahead hydraulically and it is deformed at the heating part to bend;
5. After the steel pipe deforms, spray water at it to cool it down. Thus, the required bent pipe is obtained.

The steel pipe bent by our induction bending machine features no stress and small wall thickness difference. The bending radius is adjustable within the range of 0 to 180 degrees.

Precautions
1. Before operating the induction bending equipment, prepare the equipment according to the IF power supply and IF transformer manuals. Start the equipment cooling water pump.
2. When the IF transformer is running, even with no load, it is strictly prohibited to stop the supply of cooling water. Waterway should be smooth to prevent water splashing on transformer.
3. It is allowed to open the main motor to start bending only when the steel pipe is heated to the temperature sufficient for bending and the pipe inner wall temperature is above 910℃ but lower than the permissible maximum heating temperature. It is strictly prohibited to start the main motor if the required bending temperature is not reached or the pipe is not heated. When bending is over and heating is stopped but the chuck is not released, it is also banned to start the main motor for the returning of rocker arm.
4. Before bending, the steel pipe should be carefully adjusted to make the chuck center consistent with the induction coil center. Also, the wheel used to support the pipe should be adjusted to a suitable height, so as to ensure that the pipe is fed smoothly and the bending part is in the same plane with the straight part.

 
最新产品
- 优良中频91免费黄色污网站APP
- 管端91免费黄色污网站APP
- 扩口机
- 冷拔三通机
- 成型三通机
- 等径液压三通机
- 三通金属成型机
热门产品
- 91免费看视频软件网站的检测
- 主 5000T四柱式压力机
- 500T四柱式压力机
- 91免费黄色污网站APP
- 1000T龙门式压力机
- 1620mm 链条式91免费看视频下载
- 820mm 液压中频91免费看视频下载
推荐产品
- 91免费看视频软件网站的检测
- 主 5000T四柱式压力机
- 500T四柱式压力机
- 91免费黄色污网站APP
- 1000T龙门式压力机
- 1620mm 链条式91免费看视频下载
- 820mm 液压中频91免费看视频下载
快速检索产品
 
联系91免费片版下载
沧州91免费片版下载机械设备有限公司
地址:盐山县龙凤福园20-101
邮编 : 061000
手机:15230713671
传真: 0086-317-6218625
邮箱:15230713671@163.com
关于91免费片版下载 |  产品中心 |  在线留言 |  联系91免费片版下载 © 2015-2025 沧州91免费片版下载机械设备有限公司 版权所有
冀ICP备79383337号-3 冀公网安备13092502002396号
    
网站地图